The MDOT SHA commissioned two prior studies addressing pedestrian safety concerns along US 40 Dual Highway (US 40) in Hagerstown. The prior studies identified potential causes of pedestrian injuries and fatalities in the corridor, such as missing sidewalk links and pedestrian signals, insufficient intersection lighting, sight distance issues, and inappropriate mid-block crossings. WTB was tasked with determining impacts and costs associated with providing the recommended sidewalks, pedestrian signals, signing, median fencing, and lighting along US 40.
US 40 Dual Highway Sidewalks
Sidewalk study and final design from Walnut Street to Eastern Boulevard
MDOT SHA commissioned prior studies to address pedestrian safety issues along US 40 Dual Highway in Hagerstown. These studies highlighted missing sidewalk links and signals, insufficient lighting, sight distance issues, and unsafe mid block crossings. WTB was tasked with determining the impacts and costs associated with providing the recommended sidewalks, pedestrian signals, signing, median fencing, and lighting along the corridor.
Project photos
Study background and WTB scope
Building on the two prior MDOT SHA studies, WTB advanced the US 40 Dual Highway improvements from concept to detailed design. The team evaluated how to implement the recommended safety measures while managing impacts to adjacent properties, utilities, and the traveling public.
- Assessed corridor wide pedestrian safety needs
- Evaluated impacts and costs of recommended improvements
- Advanced the project to sidewalk, signal, signing, and lighting design
Field investigations and survey
WTB conducted field investigations to identify ADA non compliant sidewalks and ramps, missing sidewalk links, and environmental features such as streams, wetlands, and rare, threatened or endangered species.
- Inventory of existing sidewalks, ramps, and missing links
- Identification of environmental features including streams, wetlands, and RTEs
- Topographic survey and utility designations at proposed SWM and signal locations
Sidewalk and ramp design
The sidewalk and ramp design focused on ADA compliance, safer crossings, and integration with existing and future development along US 40.
- Typical section development for sidewalk corridors
- Special ramp details where standard details could not be used
- Curb extensions to shorten crossings and improve visibility
- Bus stops, bus pads, and shelter pads along the corridor
- Accommodation of adjacent developer improvements
- Individually designed ramps with Type A curb retaining walls to reduce utility and right of way impacts
- Reconstruction of 30 business entrances to meet ADA requirements
- Stamped concrete crosswalks at three downtown locations
Environmental site design and stormwater management
Environmental Site Design was explored to the maximum extent practicable, with a focus on using the median where possible while minimizing impacts to utilities and right of way.
- Identified grass swale opportunities within the US 40 median
- Located swales to avoid utilities and right of way impacts
- Geotechnical borings revealed shallow rock, limiting bioswale and infiltration options
- Revised design to maximize impervious area removal and minimize new and reconstructed impervious areas
- No increase in 10 year storm discharge, eliminating peak discharge management requirements
- ESC and MOT phasing developed to allow multiple work areas and contractor flexibility
Signals, signing, and pavement markings
WTB evaluated existing traffic equipment and developed new pedestrian focused signal and signing improvements to support the sidewalk upgrades.
- Field inventory of traffic signals, signing, pavement markings, and interconnects
- Design of new pedestrian APS and CPS equipment at three intersections coordinated with ramp locations
- Signing and pavement marking design along the corridor
- Preparation of bid documents including plans, specifications, and engineers estimate of 1.4 million dollars
- Support to MDOT SHA for Invitation for Bids and addenda
Construction phase support
During Phase V, WTB supported MDOT SHA in addressing unforeseen conditions while keeping the project on schedule.
- Response to utility conflicts and pavement section issues
- Coordination regarding property owner concerns
- Preparation of redline and greenline plan revisions
- Estimate updates and SWM permit modifications to maintain contractor progress