Gas House Pike Bridge Replacement Project
This project involved replacing an aging bridge to improve safety and connectivity. Our team faced challenges with limited access and adverse weather conditions. After months of planning and execution, we successfully completed the new bridge, enhancing structural integrity and ensuring smoother traffic flow.
Gas House Pike Bridge Replacement over Linganore Creek
Capital Improvement Program project replacing two culvert structures with new bridges
The Capital Improvement Program project replaced two aging pipe culvert structures with two separate bridges carrying Gas House Pike over Linganore Creek. The primary structure, built in 1962, consisted of a four cell corrugated metal pipe culvert with concrete headwalls and wing walls and had been rated in serious condition. The adjacent smaller structure also required replacement due to frequent flooding and associated safety concerns for the traveling public.
Project photos
Project purpose and design basis
Design of the Gas House Pike Bridge Replacement began in November 2015. The new structures and roadway profile were designed to pass the 10 year storm while reducing roadway flooding and improving safety. An overflow pipe culvert between the two new bridges was added to further alleviate flooding of Gas House Pike.
- Replacement of deteriorated culvert structures with two separate bridges
- Roadway profile designed to pass the 10 year storm event
- Overflow pipe culvert placed between bridges to reduce flood related closures
Comprehensive engineering services
The project required a full range of engineering and environmental services to deliver the corridor improvements from planning through final design and construction documents.
- Topographic and field surveys and wetland identification
- Right of way plats, metes and bounds descriptions, and property and easement acquisition
- Utility coordination with multiple owners
- Hydrologic and hydraulic analysis for both structures and overflow culvert
- Environmental documentation and permitting approvals
- Stormwater management design and coordination with reviewing agencies
- Borings for soil, roadway, structural, and stormwater management design
- Foundation and scour analysis and final bridge and approach roadway design
- Contract plans, specifications, and engineers cost estimate preparation
Bridge configurations
Two new prestressed concrete girder bridges replaced the existing pipe culverts, each supported on concrete abutments and caisson foundations to provide long term performance.
- Primary bridge - 77 foot single span prestressed concrete girder bridge
- Secondary bridge - 52 foot single span prestressed concrete girder bridge
- Both structures supported on concrete abutments with caisson foundations
- Improved hydraulic opening and structural capacity compared to existing culverts
Stormwater management redesign
Stormwater management redesign was required due to stream channel migration near the SWM site and damage from the September 22 to 23, 2021 ten year storm event. These unforeseen conditions required rapid coordination among the County, WTB, the contractor, and MDE.
- Post storm field reviews and evaluation of channel migration and SWM performance
- Swift collaboration to revise the SWM design and address site changes
- Stream repair requirements from MDE incorporated into the design
- Imbricated riprap wall system over approximately 170 feet in length and 8 feet in height
Agency and stakeholder coordination
Successful delivery of the project relied on close coordination among all parties involved in the Gas House Pike corridor.
- County, consultants, reviewing agencies, utility owners, developer, contractor, and adjacent landowners
- Regular communication to address design refinements and construction needs
- Alignment of roadway, bridge, and SWM improvements with community expectations and schedule constraints
Project outcome
The Gas House Pike Bridge Replacement project delivered safer and more reliable crossings of Linganore Creek while addressing flooding concerns and long term stream stability.
- Replacement of deteriorated culvert structures with hydraulically appropriate bridges
- Reduced frequency of roadway flooding and improved public safety
- Stream repair and SWM modifications designed to address post storm conditions
- Construction schedule developed to meet community needs and minimize disruption