Baltimore Harbor Tunnel Toll Plaza

WTB led the overall project management, planning, conceptual engineering (15%) design and environmental documentation services for the MDTA’s I-895 / Baltimore Harbor Tunnel Toll Plaza and Interchange Improvement Project in Baltimore, Maryland.

Engineering Construction Innovation

Project overview

Interchange improvement planning with NEPA documentation

Due to proposed interchange improvements along I-895 that require Federal Highway Administration (FHWA) approval, the project is subject to the National Environmental Policy Act (NEPA). WTB supported the MDTA with early planning, conceptual engineering, and environmental documentation to keep decision making, permitting, and project development moving forward.

Our team coordinated with agency partners and stakeholders, documented existing conditions, evaluated alternatives, and developed conceptual plans that aligned with operational needs, safety, and long term constructability.

NEPA process and documentation

  • Existing traffic, engineering, and environmental data review
  • Alternatives development and screening
  • Impact assessment support
  • Agency coordination
  • Public outreach activities

Concept design plans

Conceptual (15%) design plans were developed for alternatives that considered operational improvements, erosion and sediment control, stormwater management, and traffic control. The work supported project purpose and need, while avoiding and minimizing potential impacts where feasible.

GIS screening, surveys and field visits

  • Desktop screening, topo surveys, and field visits
  • Wetlands and waterways review
  • 100 year floodplain and Chesapeake Bay Critical Area
  • Rare species and habitat coordination
  • Historic properties and environmental considerations
Baltimore Harbor Tunnel Toll Plaza and interchange corridor
Baltimore Harbor Tunnel Toll Plaza and interchange corridor, supporting conceptual engineering and NEPA documentation.

Project facts

Clear scope, practical deliverables

Role

  • Project management
  • Conceptual engineering (15%)
  • Environmental documentation (NEPA)

Focus

  • Traffic operations and safety
  • Environmental stewardship
  • Constructability and coordination

Agencies and coordination

  • MDTA and partnering stakeholders
  • FHWA coordination for NEPA compliance
  • Screening support for environmental resources

Project imagery

Field work, structures, and corridor elements

A quick look at typical field activities and corridor features that inform early planning, documentation, and constructable concept development.

Ready to move your next project forward
Connect with our team for transportation, structural, utility, survey, or environmental support.